How much is a ton of net work
更新时间:2020-12-30 09:24:19•点击:192 • Grid Knowledge
1. Look at the construction conditions on site
The construction difficulty of the grid and the construction environment are all important factors that affect the construction period. There are two types of construction conditions for the grid on-site. One is the overall lifting method, the overall lifting method and the overall hoisting method of assembling on the ground; the other is the high-altitude bulk, strip and block assembly and high-altitude sliding Different installation methods have different costs.
2. Look at the shape of the grid
The basic units that make up the grid are triangular pyramids, triangular prisms, cubes, truncated quadrangular pyramids and so on. And these basic units can be combined into a flat shape of a triangle, quadrilateral, hexagon, member or any other shape. Therefore, the choice of steel structure grid structure is different, its price will be different.
3. Look at the area
The area is the most basic factor that affects the price calculation. Simply speaking, the larger the area of the spherical grid, the more favorable the clearing price will be. On the contrary, the price will increase relatively.
To sum up, the calculation of the weight of the price of the net frame cleaning contract is only one of the factors. To calculate the detailed price, a professional company needs to calculate it through various cost calculations.
Recommended Reading
-
Construction technology of spherical grid
2021-01-29 14:15:02•8 次
-
Advantages of bolted ball grid structure
2021-01-29 13:52:26•10 次
-
Steel structure grid is a project that has been launched relatively quickly in the past ten years
2021-01-28 14:43:46•53 次
-
Grid processing method
2021-01-27 09:34:27•77 次


